Mr. Schaefer and the BOP has been working hard on a number of school projects. They continue to install emergency lighting throughout the building. Emergency light fixtures have been installed in the Lecture Room, Raider Room, two fixtures in the hall outside the Lecture and Raider Room, band storeage room, boys locker room, girls locker room, both stairwells, outside room 18, outside the offices, principal’s office, and secretary’s office. Other shelter in place areas yet to be done are the Band Room, and the Storeage room downstairs. We will also install an emergency lighting fixture in the boiler room.
Also, they are working on outside lighting. Along the south side walk and near the front steps new fixtures have been installed. Two new lights along the front of the building are also in the works. Those fixtures would match the two new ones.
Be sure to say thanks to the BOP members- Mr. Schaefer, Mr. Bietlich, Mr. Rich -when you see them.